High-rise buildings are commonly constructed in densely populated countries or urban areas. A well-balanced floor construction cycle is essential for the frame structure’s construction. The objectives of scheduling the floor cycle are to ensure smooth resource flows and to make the best use of formwork and other materials. To allow the labor force and formwork materials to move between zones, the floor area is usually divided into zones. As a result, the preparation of the floor construction cycle would be a resource allocation exercise.

However, when done manually, the process is complex and difficult. Floats are intentionally included in the schedule to ensure resource balance and to provide buffers. A simulation that can demonstrate real-world operations is an effective tool for dealing with this scheduling issue. There are constraints in floor cycle planning as well as the effects of working period on the overall schedule for high-rise building in Primavera P6. To investigate the issues, a network-based simulation model is used. It should be noted that shifts in working hours have a significant impact on the schedule. When the working period is extended by 20%, a time savings of 37.2% can be extended.

One of the planning objectives in the construction of a high-rise building is to ensure the early completion of the structural frames in order to generate floor areas for the execution of finishing works, building services installation, and internal fitting out. This Sample of Primavera P6 for High rise building is a good reference for you. Don’t miss it!

You will find in this XER file:

  • A baseline for Towers project (High Rise Building).
  • +10,000 Activities
  • Well-oriented WBS for (Engineering, Procurement, Construction).
  • Detailed Engineering activities.
  • Detailed Procurement activities.
  • Detailed Construction activities.
  • All activities are resource loaded.
  • In Construction WBS you will find detailed activities for (Structural works, Finishing Works, MEP Works).
  • File Format: XER  (Primavera P6).

Original price was: 35,00 $.Current price is: 14,00 $.

High Rise Building (Towers) Programme
  • XER
  • 0 Sales
  • 0 Ratings
  • 212 Views

Specification

Last Update: June 29, 2024
Relased: June 29, 2024